This project is to be installed in Sui Gas Housing Society Lahore
End to end 8 days time
Description
Scope:
- Panel Installation 5 x L3, 1 x l1 ground mounted structure
- Electric connectivity including MC4 installation and inverter commissioning
- Conduit fixing and Breaker Box Installation
- WiFi portal configuration
- Inverter Crown 10kW
- 650 W Trina Solar Modules