This project is to be installed in L-Block, DHA Phase V, Lahore

End to end 8 days time

 

Categories: , Tags: , ,

Description

Scope:

  • Panel Installation semi-raised structure (welder desired) aesthetically
  • Electric connectivity including MC4 installation and inverter commissioning
  • Conduit fixing and Breaker Box Installation
  • Cut Off Switch installation
  • Lightening Arrestor installation
  • WiFi portal configuration
  • Earth connectivity
  • Inverter Knox 10KW
  • 550 W Longi Modules