This project is to be installed in L-Block, DHA Phase V, Lahore
End to end 8 days time
Description
Scope:
- Panel Installation semi-raised structure (welder desired) aesthetically
- Electric connectivity including MC4 installation and inverter commissioning
- Conduit fixing and Breaker Box Installation
- Cut Off Switch installation
- Lightening Arrestor installation
- WiFi portal configuration
- Earth connectivity
- Inverter Knox 10KW
- 550 W Longi Modules