This project is to be installed in UET Housing Society Lahore
End to end 8 days time
Description
Scope:
- Panel Installation half L2 plus half elevated structure (welder desired) aesthetically
- Electric connectivity including MC4 installation and inverter commissioning
- Conduit fixing and Breaker Box Installation
- Cut Off Switch installation
- Lightening Arrestor installation
- WiFi portal configuration
- Earth connectivity
- Inverter Fronus 15KW installed
- Inverter Fronus 6kW installed
- Panels to be shifted
- 655 W Canadian Solar Modules
SOLAR structure and complete insulation best price
Please mention your bid