This project is to be installed in UET Housing Society Lahore

End to end 8 days time

 

Categories: , Tags: , ,

Description

Scope:

  • Panel Installation half L2 plus half elevated structure (welder desired) aesthetically
  • Electric connectivity including MC4 installation and inverter commissioning
  • Conduit fixing and Breaker Box Installation
  • Cut Off Switch installation
  • Lightening Arrestor installation
  • WiFi portal configuration
  • Earth connectivity
  • Inverter Fronus 15KW installed
  • Inverter Fronus 6kW installed
  • Panels to be shifted
  • 655 W Canadian Solar Modules