This project is to be installed in U Block, Phase 8, DHA, Lahore

End to end 8 days time

 

Categories: , Tags: ,

Description

Scope:

  • Panel Installation L2/L3 structure aesthetically
  • Electric connectivity including MC4 installation and inverter commissioning
  • Conduit fixing and Breaker Box installation
  • Cut Off Switch installation
  • Lightening Arrestor installation
  • WiFi portal configuration
  • Earth connectivity

Milestones already Achieved:

  • Inverter Huawei 10KTL installed
  • Inverter Fronus 6kW installed
  • Panels shifted to rooftop
  • DC Cables laid already

Leave a Reply