This project is to be installed in Bahria Town

End to end 5 days time

 

Description

Scope:

  • Panel Installation L5 Hi-rise
  • Electric connectivity including MC4 installation and inverter commissioning
  • Conduit fixing and Breaker Box Installation
  • Cut Off Switch installation
  • WiFi portal configuration
  • Inverter Installation
  • 660 W Canadian Solar Modules

One thought on “6.6kW On-Grid Solution (Bahria Town)

Leave a Reply

Your email address will not be published. Required fields are marked *

×