This project is to be installed in DHA Phase 7 Lahore

End to end 8 days time

 

Categories: , Tags: ,

Description

Scope:

  • Panel Installation L3
  • Electric connectivity including MC4 installation and inverter commissioning
  • Conduit fixing and Breaker Box Installation
  • Cut Off Switch installation
  • Lightening Arrestor installation
  • WiFi portal configuration
  • Earth connectivity
  • Inverter Voltronic 5KW
  • Inverter Knox 10kW
  • Panels to be shifted on Roof Top
  • 650 W Trina Solar Modules