Here you can bid on projects and product supplies.
-
5.94kW Hybrid Solution (DHA Rahbar)
-
6.955kW Off Grid Solution (PGSHF)
-
3.21kW Off Grid Solution (Jubilee Town)
-
11kW On Grid (L Block DHA Phase V)
-
10.45kW On Grid (DHA Phase V)
-
10.4kW Hybrid Solution (Sui Gas Society)
-
13kW On Grid/ 3.25 kW Hybrid Solution (DHA Phase 7)
-
8.58kW Hybrid Solution (Sui Gas Society)
-
7.26kW On Grid (DHA Phase II)
Showing all 13 results
-
10.45kW On Grid (DHA Phase V)
Acquire Project -
10.4kW Hybrid Solution (Sui Gas Society)
Acquire Project -
11kW On Grid (L Block DHA Phase V)
Acquire Project -
13kW On Grid/ 3.25 kW Hybrid Solution (DHA Phase 7)
Acquire Project -
20kW On Grid/Hybrid Solution (Phase 8 DHA Lahore)
Acquire Project -
20kW On Grid/Hybrid Solution (UET Housing Society)
Acquire Project -
3.21kW Off Grid Solution (Jubilee Town)
Acquire Project -
5.94kW Hybrid Solution (DHA Rahbar)
Acquire Project -
6.6kW On-Grid Solution (Bahria Town)
Acquire Project -
6.955kW Off Grid Solution (PGSHF)
Acquire Project -
7.26kW On Grid (DHA Phase II)
Acquire Project -
8.58kW Hybrid Solution (Sui Gas Society)
Acquire Project -
8.5kW Hybrid Solution (Gajjumata)
Acquire Project